Welcome to Mana Precast

FAQ


1. What products do you specialize in?

We design and manufacture precast concrete moulds and complete production line equipment for industrialized construction.


2. Do you provide customized solutions?

Yes. All moulds and production lines are customized based on drawings, factory layout, and production capacity requirements.


3. What is the production process after order confirmation?

Technical requirement review → contract signing → 3D design approval → manufacturing → inspection → optional factory test run before shipment.


4. How long is the lead time?

Typically 35–60 working days after design confirmation, depending on project complexity.


5. Do you provide 3D design before production?

Yes, 3D design will be provided for confirmation before manufacturing starts.


6. What quality standards do you follow?

All products undergo dimensional inspection, assembly testing, and trial operation before delivery.


7. What materials are used?

Q355B steel is used for concrete-contact surfaces, and Q235 steel is used for the remaining structural parts.


8. Do you support factory inspection and test pouring?

Yes, factory visits and test pouring are available before shipment.


9. Do you provide installation and training?

Yes, we provide installation guidance, remote support, and on-site training if required.


10. What after-sales service do you offer?

Technical support, spare parts supply, and engineering consultation are available after delivery.


11. Do you ship internationally?

Yes, we ship worldwide and support FOB or CIF terms.


12. What do you need to start a project?

Product drawings, production requirements, and factory layout.


13. How can we start cooperation?

Contact us via email or website. Our engineering team will evaluate your requirements and provide a solution and quotation.

Mana Precast