Welcome to Mana Precast
The hollow cross-section of box girders reduces the overall structural weight and material consumption while maintaining the required load-bearing capacity. This helps optimise bridge design and reduce construction costs.

Mana is a professional manufacturer of formwork for precast concrete components, providing customised solutions for the construction industry. With advanced manufacturing equipment and an experienced technical team, we design and manufacture formwork to meet project-specific drawings, dimensions and technical requirements.
Through years of manufacturing experience, Mana has continuously improved and refined its highway box girder formwork. Our formwork is designed to meet demanding production requirements, ensuring dimensional accuracy, structural stability and reliable performance across a wide range of bridge construction projects.
Large-Size External Formwork: To facilitate transportation and demoulding, the external formwork is designed with as few joints as practicable. This simplifies on-site assembly and reduces the number of connections between side forms, shortening formwork erection and stripping times.
Integrated Structure: The formwork and supporting truss are designed as an integrated structure, reducing on-site assembly work and labour requirements.
Convenient Adjustment: The external formwork columns are fitted with adjustable base supports, allowing the formwork height and vertical alignment to be adjusted quickly and accurately during installation and stripping.
High-Precision Joints: Both ends of the side forms are precision-machined by milling to achieve joint gaps of less than 1 mm. Combined with dovetail-profile rubber seals and sponge rubber sealing strips, this design helps prevent grout leakage and formwork misalignment, improving the surface quality of the finished box girders.
High-Strength Materials: High-quality structural steel is selected to provide the required strength, wear resistance and durability, ensuring reliable performance and a long service life.
In addition to individual box girder formwork, Mana also offers automated box girder production systems for precast concrete plants.
The automated box girder production system integrates intelligent equipment for reinforcement tying, post-tensioning, duct grouting and curing. It significantly improves production safety, product quality and manufacturing efficiency in precast concrete plants.
Each production stage follows an integrated, intelligent assembly-line workflow, covering the complete precasting cycle:
Reinforcement tying → Concrete pouring → Steam curing → Post-tensioning → Beam transfer → Prestressing duct grouting
Under suitable production conditions, the system can reduce the production cycle for box girders from approximately 12 days to 4 days.
For projects with limited site space, tight construction schedules, high production volumes and complex working conditions, the automated box girder production system offers significant advantages, particularly for projects requiring more than 2,000 large, standardised girders.
Customised Service: We provide tailor-made formwork solutions based on your project drawings, technical specifications and production requirements.
Timely Delivery: With sufficient raw material stocks and established manufacturing capacity, we are well-equipped to meet agreed delivery schedules.
Technical Support: Our technical team provides professional advice and installation and operation guidance to support your project.
Comprehensive After-Sales Service: All formwork products are covered by a two-year warranty.